cf.Data.override_calendar

Data.override_calendar(calendar, inplace=False, i=False)[source]

Override the calendar of the data array elements.

Not to be confused with using the change_calendar method or setting the d.Units.calendar. override_calendar is different because the new calendar need not be equivalent to the original ones and the data array elements will not be changed to reflect the new units.

Parameters:
calendar: str

The new calendar.

inplace: bool, optional

If True then do the operation in-place and return None.

i: deprecated at version 3.0.0

Use inplace parameter instead.

Returns:

Data

Examples:

TODO